Overview
Six Facilities on FM 1209
Starlink terminals since 2021, the Gigasat Factory since June 2026, a turbine foundry since August 2026, and the X and Boring headquarters.
The SpaceX Bastrop Complex is a group of SpaceX, X Corp. and Boring Company facilities on FM 1209 near FM 969 in unincorporated Bastrop County, about 30 miles southeast of Austin. Musk companies began buying land here in 2021 and have assembled more than 1,000 acres; SpaceX employs about 1,600 people on site.
It is one of the three manufacturing supernodes of the Austin Supercluster, with Tesla Giga Texas and Samsung Taylor. Unlike those two, it is not one heavy plant but a cluster of SpaceX hardware lines: Starlink terminals and chip packaging, the Gigasat satellite and solar campus, and a turbine blade foundry.
| Facility | Operator | Function | Status |
|---|---|---|---|
| SpaceX Gigasat Factory | SpaceX | AI1 orbital data center satellites, with solar ingots, wafers and cells, circuit boards and terminals | Unveiled June 2026; solar cell plant under construction; satellites targeted for end of 2027 |
| Starlink Factory | SpaceX | Starlink user terminals; in-house circuit boards, panel-level packaging and a failure analysis lab | Terminals in volume; packaging and circuit board lines targeting end of 2026 |
| Blades and Vanes Foundry | SpaceX | Single-crystal superalloy blades and vanes for gas turbines | Confirmed August 2026; no operating date |
| X Corp. headquarters | X Corp., inside SpaceX through SpaceXSI | Corporate headquarters and safety support center at Hyperloop Plaza | Headquarters since late 2024 |
| The Boring Company headquarters | The Boring Company | Headquarters and tunnel boring machine engineering at Hyperloop Plaza | Operating since 2021 |
| Snailbrook | Musk affiliates | Employee housing, the Boring Bodega and the Ad Astra school | 110 homes in early plans; growth tied to city wastewater |
Gigasat
From Ingot to Orbit
Select a stage to see its suppliers in the ring.
- PlannedIngots and wafersSolar-grade silicon grown and sliced on site
- Under constructionSolar cells10 GW a year on two 5 GW floors
- Under constructionCircuit boardsBoards for satellite and terminal electronics
- PlannedComponentsBoard-level electronic assemblies
- Under constructionAdvanced packagingRF chips first; radiation-tolerant compute later
- OperatingTerminals and gatewaysThe existing Starlink terminal line
- PlannedAI1 final assemblyAbout 150 kW of solar array per satellite
- PlannedDevelopment and testQualification and environmental testing
The Gigasat Factory covers 11 million square feet on about 1,000 acres, more floor area than the main building at Giga Texas. It is built to make AI1 orbital data center satellites and most of what goes into them, starting with a 10 GW a year solar cell plant. SpaceX is targeting 1 GW a year of orbital AI compute by the end of 2027.
The solar plant sets the ceiling on the constellation: each AI1 carries about 150 kW of array, so the constellation can only add power as fast as Bastrop makes cells. No other satellite maker runs from solar ingot to finished spacecraft at one site.
The supplier ring
The Bastrop Supplier Ring
Few suppliers sit nearby yet: Bastrop assembles and packages, and the silicon arrives from Europe and Asia.
- United States
- Europe
- Taiwan, multiple or undisclosed
Select a supplier
Each dot is a supplier. Distance from the center is how close it sits to Bastrop; the wedge is the line it serves; color is the parent company's home country; a solid dot is a confirmed partner, a hollow dot is inferred from capability.
The ring maps 26 suppliers. It was built for the Starlink terminal and packaging lines before the Gigasat announcement, so it is a first cut: 6 entries are confirmed STMicroelectronics partnerships, and the rest are inferred from the equipment and materials those lines require. The 4 solar entries cover polysilicon through cell equipment.
The confirmed silicon comes from far away: STMicroelectronics co-designs the phased-array chips, fabricates them in Crolles, Rousset and Malta, and packages them in Muar, Malaysia. Bastrop's panel-level packaging line brings the last of those steps to Texas, with Starlink as ST's lead customer for the process.
All 26 suppliers as a table
| Supplier | Location | Serves | Proximity | Origin | Evidence | Also supplies |
|---|---|---|---|---|---|---|
| Bluebonnet Electric Cooperative | Bastrop, USA | Campus power and automation | Bastrop County | United States | Inferred from capability | - |
| Catson SoC Platform | Geneva, Switzerland | Starlink terminals and packaging | Outside the US | Europe | Confirmed partner | Tesla Giga Texas |
| Cell Process Equipment | Multiple | Gigasat solar | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | T1 Energy G2 Austin, Samsung Taylor, Tesla Giga Texas |
| Connectors and Interconnect | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | SpaceX Starbase |
| Contract Manufacturing (Historic) | Taiwan | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| Copper-Clad Laminate and Prepreg Supply | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| Crystal Growth Furnaces (Czochralski Pullers) | Multiple | Gigasat solar | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | Tesla Megapack Brookshire |
| Enclosure, Motors and Mechanical Assembly | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| ERCOT Interconnection | Austin, USA | Campus power and automation | Elsewhere in Texas | United States | Inferred from capability | - |
| Factory Automation and Robotics | Multiple | Campus power and automation | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | Tesla Megapack Brookshire, Fermi America, Meta Temple, SpaceX Starbase, Stargate Abilene, Tesla Giga Texas |
| Flash Memory and DRAM | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| GNSS Receiver | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| Industrial Gases | USA | Starlink terminals and packaging | Elsewhere in Texas | United States | Inferred from capability | - |
| Inspection and Metrology | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | Samsung Taylor, Tesla Giga Texas |
| Lithography and RDL Patterning Equipment | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| Packaging Substrates and Films | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| Panel-Level Packaging Equipment | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| PCB Fabrication Equipment | Multiple | Starlink terminals and packaging | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | - |
| Polysilicon Feedstock | Hemlock, USA | Gigasat solar | Elsewhere in the US | United States | Inferred from capability | T1 Energy G2 Austin |
| Rogers Corporation RF Laminates | Chandler, USA | Starlink terminals and packaging | Elsewhere in the US | United States | Inferred from capability | - |
| ST Crolles / Rousset Wafer Fabs (France) | Crolles, France | Starlink terminals and packaging | Outside the US | Europe | Confirmed partner | Tesla Giga Texas |
| ST Malta Wafer Fab | Kirkop, Malta | Starlink terminals and packaging | Outside the US | Europe | Confirmed partner | Tesla Giga Texas |
| ST Muar Packaging and Test (Malaysia) | Muar, Malaysia | Starlink terminals and packaging | Outside the US | Europe | Confirmed partner | Tesla Giga Texas |
| ST Panel-Level Packaging Process (Starlink Lead Customer) | Geneva, Switzerland | Starlink terminals and packaging | Outside the US | Europe | Confirmed partner | Tesla Giga Texas |
| STMicroelectronics Custom Silicon Co-Design | Geneva, Switzerland | Starlink terminals and packaging | Outside the US | Europe | Confirmed partner | Tesla Giga Texas |
| Wafering and Wire Saw Equipment | Multiple | Gigasat solar | Outside the US | Taiwan, multiple or undisclosed | Inferred from capability | Tesla Megapack Brookshire |
Cedar Creek
Same Reasons, a Few Miles Apart
The Cedar Creek Data Center Cluster on FM 535 is forming a few miles south of the complex for the reasons SpaceX came: cheap, large parcels, an unincorporated county with no city permitting layer, and transmission at the eastern edge of the Austin grid. EdgeConneX, Amazon Web Services and BlackChamber have filed or assembled more than 4,400 acres and $7.8B of disclosed projects there since late 2024.
The two meet at gas turbines. BlackChamber plans a 710 MW gas plant, and the turbine queue for every gas-powered campus is set by hot-section blade casting, which is what the Blades and Vanes Foundry is built to make.
| Factor | SpaceX Bastrop Complex | Cedar Creek cluster |
|---|---|---|
| Land | More than 1,000 acres assembled since 2021; about 830 more for the foundry in 2026 | AWS 1,300 acres; BlackChamber 2,842 acres; EdgeConneX three campuses on FM 535 |
| Rules | Unincorporated Bastrop County: no city zoning or municipal permitting | The same county, the same lack of a city overlay; EdgeConneX won a 10-year county tax abatement |
| Power | Bluebonnet Electric distribution on ERCOT transmission at the eastern edge of the Austin grid | The same transmission corridors; BlackChamber pairs a 710 MW gas plant with 490 MW of data centers |
| Neighbors | Giga Texas and Terafab a short drive west; Austin about 30 miles | The SpaceX complex a few miles north; Giga Texas about 15 miles |
| Friction | Wastewater for Snailbrook; rush-hour commutes doubled from about 20 to 40 minutes | State data center permit pause since September 2026; BlackChamber tax abatement requests withdrawn |
The Texas footprint
Bastrop in the SpaceX Texas Footprint
Bastrop is SpaceX's Texas site for everything that is not a rocket. Satellites and terminals made here fly from Starbase, and the packaging line ties it to the Texas silicon chain from design in Austin to fabrication at Taylor and Gibbons Creek.
| Site | Location | Link to Bastrop |
|---|---|---|
| SpaceX Starbase | Cameron County | Starship builds and launches; Starlink and AI1 satellites from Bastrop fly from here |
| SpaceX McGregor | McLennan County | Raptor engines; a possible customer for turbopump castings from the foundry |
| Tesla Giga Texas and Terafab | Travis County | Tesla designs the AI chips; SpaceX plans to package radiation-tolerant compute chips at Bastrop later |
| Samsung Taylor Fab | Williamson County | Fabricates Tesla AI silicon |
| Terafab Gibbons Creek | Grimes County | Volume fabrication of later generations |
| TIE NGMM Center | UT Austin | DARPA-funded 3D heterogeneous integration packaging research |
Record
Dataset Record
- Dataset
- Bastrop sheet of the Supplier Rings workbook, 26 suppliers, compiled before the Gigasat announcement
- Wedge
- From the dataset Sector field: packaging, electronics and terminal entries to Starlink; solar to Gigasat; grid and automation to campus
- Evidence
- The dataset Status field: Core shown as confirmed, Flagged as inferred from capability
- Origin
- Home country of the parent company; multi-vendor entries shown as multiple
- Also supplies
- Each named operator matched against the other anchor rings in the Supplier Rings workbook; solar equipment and feedstock also matched by function where the other ring lists no vendor
- Map
- Facility and data center locations approximate
- Last verified
- Q4 2026