Overview
A 2 GW Grid-Connected AI Cloud Hub in the West Texas Wind Corridor
The Sweetwater hub has two sites: Sweetwater 1 at 1,400 MW on about 1,700 acres, and Sweetwater 2 at 600 MW on about 500 acres. IREN energized the Sweetwater 1 high-voltage substation in May 2026 and is building 300 MW (gross) of data center capacity there for delivery in Q4 2027. Sweetwater 2 is expected to energize in 2028, with a direct fiber loop planned between the sites.
On Sept 8, 2026, IREN said ERCOT (Electric Reliability Council of Texas) had conditionally included the full 2 GW hub as base load in Batch Zero, the first round of ERCOT's batch study process for large loads.
| Operator | IREN Ltd (Nasdaq: IREN) |
|---|---|
| Location | Near Sweetwater, Nolan County |
| Distance from Austin | About 230 mi NW |
| Capacity | Sweetwater 1: 1,400 MW; Sweetwater 2: 600 MW |
| Land | About 2,200 acres across two sites |
| Power | ERCOT grid; IREN reports renewable sourcing |
| First phase | 300 MW gross, delivery Q4 2027 |
| Sweetwater 2 | Energization expected 2028 |
| Workload | IREN AI Cloud: training and inference |
| Status | Under construction |
Energy model
Sweetwater Draws on Wind Transmission Texas Built More Than a Decade Ago
Sweetwater runs on the ERCOT grid with no on-site generation. Its power advantage is transmission: the Competitive Renewable Energy Zones (CREZ) program, a roughly $7B set of lines the Public Utility Commission of Texas (PUCT) ordered and completed in the early 2010s to carry West Texas wind to eastern load centers. Nolan County sits in the middle of that wind fleet, near the Roscoe Wind Complex.
IREN reports renewable supply through clean sources or renewable energy certificates; it does not publish a site-level mix for Sweetwater. Large-load rules under Texas SB 6 (2025) govern how the hub connects. See ERCOT large load interconnection.
Deal structure
IREN Owns, Builds and Operates, Then Sells GPU Capacity Directly
IREN, formerly Iris Energy, is a Sydney-founded, Nasdaq-listed company moving from bitcoin mining to AI cloud services. It owns the land and the grid connection, builds the halls, buys the GPUs and sells managed GPU capacity to customers. No landlord, lessee or neocloud sits between IREN and its buyers, unlike the four-firm split at Hut 8 Beacon Point.
IREN's named customers sit at its Childress campus in Texas: a $9.7B Microsoft AI cloud contract (first 50 MW delivered August 2026) and a $3.4B, five-year Nvidia contract for about 60 MW. Nvidia also holds a five-year warrant for up to 30 million IREN shares at $70. In August 2026 IREN signed a multi-year contract with an unnamed frontier AI lab. IREN has not named a Sweetwater customer.
Constraints
Delivery Depends on ERCOT Approval and GPU Financing
ERCOT's Batch Zero classification is conditional and subject to further approval. IREN finances GPUs contract by contract; its Microsoft deployment used $3.6B of investment-grade GPU financing plus customer prepayments. The full 2 GW build depends on signing customers for Sweetwater capacity.
Record
Dataset Record
- Sources
- IREN (FY26 results, SEC filings, Sept 8 2026 release), Data Center Dynamics, Global Data Center Hub, Texas Data Center Watch, Nolan County reinvestment zone minutes
- Last verified
- October 2026