AustinIO > Texas Nexus > Texas Triangle > Austin Metro Directory > Austin Data Centers


Austin Data Centers

Austin metro's data center substrate has scaled rapidly since approximately 2021 to become one of the most rapidly-growing US data center markets. The metro's combined operational, construction, and announced capacity through 2030 substantially exceeds 8 gigawatts across multiple major buildouts plus continued hyperscale and AI-focused operator concentration. Williamson County in eastern Austin metro hosts the densest concentration via the Samsung Oncor Effect: Samsung's $40 billion Taylor advanced semiconductor manufacturing campus drove Oncor (Texas's largest electric utility) to build major transmission infrastructure across eastern Williamson County, which subsequently opened the door for hyperscale data center operators that need reliable multi-hundred-megawatt power access. Major Williamson County buildouts include Meta's Temple campus, Skybox/Prologis Hutto Megasite, broader Hutto/Taylor/Georgetown corridor, plus continued continued hyperscale buildout.

Austin metro's specific position within the broader Texas data center substrate is structurally distinctive precisely because of the metro's continued operator-anchored substrate growth pattern. The Samsung Oncor Effect transmission infrastructure, the broader Tesla Giga Texas substrate, the broader Austin AI-Industrial buildout supports continued continued data center operator concentration at scales structurally distinct from DFW (the established 248-facility / 71-operator US second-largest market) and Houston (the enterprise-and-industrial substrate).

Austin Data Center and Colocation Operators

Company Location Primary Categories
365 Data CentersAustin metroEdge Colocation, Network Services
Aligned Data CentersAustin metroWholesale Colocation, Hyperscale
Amazon Web Services (AWS)Austin metroHyperscale Cloud Infrastructure
CloudBurst Data Centers (Evolve San Marcos I)San Marcos (Hays County)Hyperscale (1.2 GW behind-the-meter natural gas)
CologixAustin metroInterconnection, Network-Dense Colocation
Compass DatacentersAustin metroWholesale, Build-to-Suit
CoreSite (American Tower)Austin metroNetwork-Dense Colocation, Cloud Onramps
CoreWeaveAustin metroAI Infrastructure, GPU Cloud
Crusoe Energy SystemsAustin metroAI Infrastructure, Stranded-Energy Compute
CyrusOneAustin metro (Round Rock, broader expansion)Wholesale Colocation, Hyperscale
DataBankAustin metroEdge Colocation, Enterprise
Digital RealtyAustin metroWholesale Colocation, Hyperscale
EdgeConneXAustin metroEdge Data Centers, Network Infrastructure
Equinix (DA1, broader Austin facilities)Austin (downtown), broader metroRetail Colocation, Interconnection
FlexentialAustin metroHybrid IT, High-Density Colocation
Google Cloud PlatformAustin metroHyperscale Cloud Infrastructure
H5 Data CentersAustin metroWholesale Colocation
Hewlett Packard EnterpriseAustin metroEnterprise Compute, Cloud Infrastructure
Horizon TACC (UT Austin / Sabey Data Centers)Round Rock (Sabey campus)NSF Academic Supercomputing, AI Research
Iron Mountain Data CentersAustin metroWholesale Colocation, Compliance-Focused
Lumen TechnologiesAustin metroNetwork Infrastructure, Cloud Services
Meta Platforms (Temple Datacenter Campus)Temple (Bell County, Williamson County corridor extension)Hyperscale Cloud Infrastructure
Microsoft AzureAustin metroHyperscale Cloud Infrastructure
Nautilus Data TechnologiesAustin metroLiquid Cooling, AI Infrastructure
NTT Global Data CentersAustin metroHyperscale, Wholesale Colocation
Oracle Cloud InfrastructureAustin (HQ following 2020 relocation)Hyperscale Cloud Infrastructure
Prime Data CentersAustin metroWholesale Colocation
QTS Realty Trust (Blackstone)Austin metroHyperscale, Wholesale Colocation
Sabey Data CentersRound RockWholesale Colocation, Academic Compute (TACC)
Skybox Datacenters / PrologisHutto (Williamson County)Hyperscale Megasite (~600 MW prospective)
Stream Data CentersAustin metroWholesale Colocation, Hyperscale
Switch (Vantage)Austin metroHyperscale, Wholesale Colocation
T5 Data CentersAustin metroWholesale Colocation, Build-to-Suit
Tesla AI Data Center (Cortex 1, Cortex 2)Giga Texas (Travis County)Captive AI Training Infrastructure
TierPointAustin metroHybrid IT, Multi-Tenant Colocation
Tract Capital ManagementCaldwell County (1,515-acre, 2 GW campus)Land Banking, Hyperscale Development
Vantage Data CentersAustin metroHyperscale Wholesale Colocation
Vapor IOAustin (HQ)Edge Computing, Network Infrastructure
Verizon Network OperationsAustin metroNetwork Infrastructure, Edge Compute

Related Coverage

Austin Metro Directory | Texas Triangle Cluster | Texas Nexus | ERCOT Energy Sovereignty | Why Texas: The Structural Logic of AI-Industrial Concentration | Georgetown-Hutto-Taylor Datacenter Corridor | DFW Datacenters B2B | Houston Datacenters B2B | San Antonio Datacenters B2B | Austin Semiconductor B2B | Austin Aerospace B2B | Austin Energy B2B | Austin Advanced Manufacturing B2B | Spotlights Hub