AustinIO > Texas Nexus > TX LLM Footprint > Anthropic Compute: Abernathy


Abernathy Data Center

Anthropic is the primary tenant at the Abernathy data center in Abernathy, Hale County. AI Training compute for Claude is consumed here.

Tenant: Anthropic
Facility: Abernathy
Operator: Fluidstack (operator) / TeraWulf (exited) / Google (backstop)
Location: Abernathy, Hale County
Capacity (MW): 168
Status: Under Construction
Type: AI Factory
Workload: AI Training
Product: Claude
Power: ERCOT grid, West Texas wind corridor
GPU: Nvidia GPUs
Operational: H2 2026
Investment (B): 1.3

Notes: 168 MW critical IT (about 240 MW gross) on 120 acres. Formed Oct 2025 as a TeraWulf-Fluidstack JV backed by Google; TeraWulf sold its entire 50.1% stake to Fluidstack in 2026