AustinIO > Texas Nexus > TX LLM Footprint > Anthropic Compute: Abernathy
Abernathy Data Center
Anthropic is the primary tenant at the Abernathy data center in Abernathy, Hale County. AI Training compute for Claude is consumed here.
| Tenant: | Anthropic |
| Facility: | Abernathy |
| Operator: | Fluidstack (operator) / TeraWulf (exited) / Google (backstop) |
| Location: | Abernathy, Hale County |
| Capacity (MW): | 168 |
| Status: | Under Construction |
| Type: | AI Factory |
| Workload: | AI Training |
| Product: | Claude |
| Power: | ERCOT grid, West Texas wind corridor |
| GPU: | Nvidia GPUs |
| Operational: | H2 2026 |
| Investment (B): | 1.3 |
Notes: 168 MW critical IT (about 240 MW gross) on 120 acres. Formed Oct 2025 as a TeraWulf-Fluidstack JV backed by Google; TeraWulf sold its entire 50.1% stake to Fluidstack in 2026