AustinIO > Texas Nexus > TX LLM Footprint > AWS Compute: AWS GW Ranch


AWS GW Ranch Data Center

AWS is the primary tenant at the AWS GW Ranch data center in Pecos County. AI + Cloud compute for Nova + AWS is consumed here.

Tenant: AWS
Facility: AWS GW Ranch
Operator: Amazon AWS / Pacifico Energy (power developer)
Location: Pecos County
Capacity (MW): 7,650
Status: Under Construction
Type: AI Factory
Workload: AI + Cloud
Product: Nova + AWS
Power: Off-grid behind-the-meter: 35 gas turbines up to 7.65 GW, plus 750 MW solar and 1.8 GW battery
GPU: Trainium / Nvidia
Operational: Dec 2026 first buildings
Investment (B):

Notes: 8,000-acre campus acquired from Pacifico Energy; Amazon confirmed ownership Aug 2026. Three 189,000 sq ft buildings permitted at about $300M each. AWS's first major behind-the-meter off-grid commitment. Permitted emissions upward of 30M metric tons CO2 per year. The 7.65 GW is generation capacity, not IT load.