AustinIO > Texas Nexus > TX LLM Footprint > Anthropic Compute: Cedar Creek
Cedar Creek Data Center
Anthropic is the primary tenant at the Cedar Creek data center in Cedar Creek, Bastrop County. AI Training compute for Claude is consumed here.
| Tenant: | Anthropic |
| Facility: | Cedar Creek |
| Operator: | Pacifico Energy / BlackChamber |
| Location: | Cedar Creek, Bastrop County |
| Capacity (MW): | 710 |
| Status: | In Talks |
| Type: | AI Factory |
| Workload: | AI Training |
| Product: | Claude |
| Power: | On-site natural gas plant |
| GPU: | TBD |
| Operational: | TBD |
| Investment (B): |
Notes: 2,842-acre planned campus; Anthropic reported in talks to occupy it (Austin Business Journal, Aug 2026). Organized local opposition. The 710 MW figure is the planned gas plant, not confirmed IT load.