Profile
Microsoft at Microsoft Pecos (Project Kilby)
| Tenant | Microsoft |
|---|---|
| Facility | Microsoft Pecos (Project Kilby) |
| Operator | Microsoft / Chevron subsidiary Energy Forge One (power) / Engine No. 1 |
| Location | Pecos, Reeves County |
| Capacity (MW) | 2,000 |
| Status | Announced / FID Pending |
| Type | AI Factory |
| Workload | AI + Cloud |
| Product | MAI + Azure |
| Power | Off-grid behind-the-meter: 2.67 GW co-located gas, GE Vernova and Solar Turbines, SCR for NOx |
| Chips | TBD |
| Operational | First power 2028 |
| Investment ($B) | - |
Notes
Site Notes
Roughly 2 GW added to Microsoft's global capacity, built over five to seven years. Chevron signed a 20-year PPA. Closed-loop cooling taking only an initial water charge, drawing brackish non-potable groundwater. The 2,000 MW is the data center figure; the 2.67 GW is generation.
Other sites
Other Microsoft Sites in Texas
| Facility | Location | Status | Capacity (MW) |
|---|---|---|---|
| Microsoft Abilene (Crusoe) | Abilene, Taylor County | Under Construction | 900 |
| Microsoft Castroville | San Antonio and Castroville | Operational / Under Construction | - |
Record
Dataset Record
- Dataset
- Frontier lab and hyperscaler data centers in Texas (llm_data_centers2026), row AI026
- Fields
- Shown as stored; the company page carries the reviewed narrative