AustinIO > Texas Nexus > TX LLM Footprint > Meta Compute: Meta El Paso


Meta El Paso Data Center

Meta is the primary tenant at the Meta El Paso data center in El Paso, El Paso County. AI Training + Inference compute for Muse is consumed here.

Tenant: Meta
Facility: Meta El Paso
Operator: Meta / BlackRock (GIP) joint venture
Location: El Paso, El Paso County
Capacity (MW): 1,000
Status: Under Construction
Type: AI Factory
Workload: AI Training + Inference
Product: Muse
Power: El Paso Electric grid plus 813 modular gas generators (366 MW)
GPU: Nvidia GPUs / Meta MTIA
Operational: 2028
Investment (B): 10

Notes: Ground broken Oct 2025 at $1.5B and 1.2M sq ft; raised to $10B and 1 GW on 26 Mar 2026. A BlackRock strategic venture now develops the campus with Meta as construction manager and initial sole occupant. Meta has contracted 5,000+ MW of clean power to the Texas grid.