Meitner Energy Center Data Center

Google is the primary tenant at the Meitner Energy Center data center in Pampa, Gray and Roberts counties. AI Training + Cloud compute for Gemini + Google Cloud is consumed here.

Tenant: Google
Facility: Meitner Energy Center
Operator: Google / Intersect Power (Alphabet subsidiary)
Location: Pampa, Gray and Roberts counties
Capacity (MW): 840
Status: Under Construction
Type: AI Factory
Workload: AI Training + Cloud
Product: Gemini + Google Cloud
Power: Off-grid: co-located 1+ GW wind, solar, 3 GWh battery, plus on-site gas for firming
GPU: Google TPU
Operational: 2027-2028
Investment (B): 14

Notes: Google's Pampa location. Four buildings totaling roughly 2.25M sq ft, requiring up to 840 MW. Generation is built on the same site rather than drawn from ERCOT after the fact. Air-cooled, so water use is limited to domestic.