Microsoft at Microsoft Abilene (Crusoe)
| Tenant | Microsoft |
|---|---|
| Facility | Microsoft Abilene (Crusoe) |
| Operator | Crusoe (developer, owner, operator) / Microsoft (anchor tenant) |
| Location | Abilene, Taylor County |
| Capacity (MW) | 900 |
| Status | Under Construction |
| Type | AI Factory |
| Workload | AI Training + Inference |
| Product | MAI |
| Power | Dedicated 900 MW on-site power plant plus medium-voltage battery energy storage |
| Chips | Nvidia (next-gen) |
| Operational | mid-2027 first building |
| Investment ($B) | - |
Notes
Site Notes
Oracle and OpenAI scrapped expansion beyond the initial 1.2 GW in Mar 2026; Bloomberg reported Nvidia put down a deposit to help line up a replacement, and Meta was briefly expected to take it. Crusoe announced Microsoft as tenant 27 Mar 2026. Two buildings at 336 MW critical IT each. Closed-loop non-evaporative liquid cooling.
Other sites
Other Microsoft Sites in Texas
| Facility | Location | Status | Capacity (MW) |
|---|---|---|---|
| Microsoft Pecos (Project Kilby) | Pecos, Reeves County | Announced / FID Pending | 2,000 |
| Microsoft Castroville | San Antonio and Castroville | Operational / Under Construction | - |